03 System configuration

Sixty kilometres, six decisions

The reference configuration is explicit. Everything the concept leaves open is listed as an engineering decision that must close before procurement.

Reference configuration

ParameterReference configurationStatus or clarification
Project nameGran Barrera Oceánica GBO 60×60Working identity
Intervention areaCozumel Channel, Quintana Roo, MexicoOffshore, regional scale
General endpointsBoca Paila to the southern tip of CozumelRoute requires georeferencing and survey
Nominal barrier length60 km totalManufactured length, not interception width
Segment arrangementSix staggered segmentsGaps and overlaps to be designed
Nominal orientation60 degrees toward the northeastHeading convention to be confirmed
Diversion targetGreater than 90 percentPerformance target, not a measured result
Proposed benefitSeven coastal destinationsSubject to pathway verification
Float diameter60 inches / 1.524 mCylindrical floats
Pipe material conceptHigh density polyethyleneHDPE, grade and SDR to be specified
Pipe size history32–52 inches in the conferenceUnresolved against the 40 inch illustration
Position managementMoorings, positioning motors and support tugsIntegrated architecture to be selected
Navigation provisionOpen water gaps and navigation markingAuthority approved scheme required
Reference investmentUSD 91.464 millionConcept estimate at USD 1.5244 M/km
Indicative programme10 weeks of studies plus 15 monthsApproximately 17 months, no start date
Design lifeNot yet specifiedRequired before structural design

Values as reported in the source presentation. Where a value is a concept rather than a specification, the third column states what must be established.

Cross section of the assembly concept. Dimensions and draft are indicative only.
Mooring interface at the seabed. Foundation type follows site investigation, not assumption.

What the system is made of

C01

Pipe and float assembly

HDPE pipe with 60 inch cylindrical floats, internal buoyancy alternatives and articulated interfaces. Cross sections must be released only after buoyancy, draft and freeboard are fixed.

C02

Joints and connections

Thermally fused pipe joints with qualified procedures and traceable batches; articulated joints with their own load path, rotation limits and fatigue assessment.

C03

Mooring and station keeping

A semisubmerged anchoring concept combined with positioning motors and support tugs, sized for waves, currents, water level change and controlled repositioning.

C04

Position and structure monitoring

GPS beacons, load and structural observation, solar power and battery autonomy, with alarms that distinguish alert, warning and limit.

C05

Navigation safety

Gaps for vessel passage, navigation lights and marking developed with the competent maritime authority.

C06

Fleet and support

Small vessels, floating platforms, collection vessels and positioning tugs, with a shore base and a stated weather window policy.

How diversion is meant to work

An oblique floating structure influences the near surface path of drifting sargassum. Biomass encountering the structure is intended to move along it toward a controlled release area.

Accumulation, passage underneath, overtopping, leakage through gaps and return circulation are all possible outcomes. Each must appear in the analysis; a model that treats the barrier as perfectly impermeable and perfectly guiding would prejudge the result.

Two angles with different meanings

A geographic bearing describes the segment on a chart. The relative angle between the segment and the local current controls crossflow loading and influences biomass movement. Reported currents of roughly 40 to 60 degrees make this a time series and an operating limit, not a fixed drawing note.

Controlled adjustment

The concept describes a fixed or hinged reference point and a tug acting near the free end. A credible manoeuvring plan quantifies mooring response, connection rotation, tug capability, line tension, sweep area and navigation exclusion. As a geometric illustration, a two degree rotation of a rigid 10 km line displaces the tip roughly 349 m; a flexible barrier responds differently.

Segment connection. The load path, rotation limit and inspection access require dedicated design.
Reference visualisation of the installed barrier. Concept imagery, not an as-built record.

Engineering questions the concept leaves open

Buoyancy basis
Displaced seawater volume against all installed mass, with reserve buoyancy demonstrated in intact and specified damaged conditions.
Damaged condition
Compartment boundaries and monitoring so one local failure does not produce uncontrolled progressive flooding.
Load cases
Crossflow, wave, tow, installation, mooring excursion and repositioning, with fatigue demand over the service life.
Material qualification
UV resistance, creep, bending strain and marine growth behaviour, verified rather than assumed from a product label.
Interfaces
One accountable owner per interface between pipe, floats, joints, moorings, power and control.
Recovery
Design for eventual removal: recoverable anchors, lines and floats, traceable materials.
These are not open questions in a negative sense. They are the definition of the next phase, and each one has an owner, an evidence requirement and a decision gate.